Work on continued upgrades is underway at Port Royal Speedway as the holidays approach. 

 Numerous new light poles have been placed inside of turns three and four with increased and upgraded lighting to be installed.  Meanwhile, a total leveling of the ground has been made from turn four all the way to the grandstand as efforts to install new seating and improved drainage continue.  A large tree has also been felled adjacent to the Floral Hall. 
PC191352 PC191351 PC191350
PC191349 PC191347 PC191346